Quality control

Traceability

Traceable identification and documentation planned from casting through final inspection.

Match traceability depth to project risk

Traceability can begin with material heat and casting lot and continue through heat treatment, machining, finishing, inspection, packaging and final reports. The required depth should be defined before production so markings and record relationships are not added retrospectively.

Define in the RFQ

  • Heat-, lot- or piece-level traceability
  • Cast-in, laser, mechanical marking or label format
  • Material certificates, inspection and test reports
  • Records for nonconformance, rework and release
  • Record-retention period and electronic format

Part marking options

Laser and mechanical marking are available for suitable components. Typical content can include part number, serial or lot identification, revision, symbols or a customer-defined pattern. The drawing should define the required content, location, orientation and any depth/appearance limitation, particularly near sealing, fatigue-critical, hygienic or cosmetic surfaces.

The marking method is selected around material, geometry, surface condition and traceability depth. A visible mark is useful only when it remains linked to the corresponding heat/lot and inspection records.

Digital production support

ERP and MES functions can support order status, production progress, nonconformance traceability, equipment state, quality records and controlled work instructions. These systems connect the released process route with shop-floor execution; they do not replace the drawing or inspection plan.

Inspection evidence to specify

Request/agree at RFQ stageAcceptance criteria, test stages and required documentation
Drawing revision, critical interfaces and inspection datumsTechnique, coverage, sensitivity and acceptance standard
Reporting format, traceability and sampling levelScope, test method and evidence depend on the drawing, service risk and agreed contract.

These are documentation requirements, not downloadable actual inspection reports or proof of an individual order.

Illustrative process or factory photograph; not an actual inspection report for your part.

Illustrative process or factory photograph; not an actual inspection report for your part.

Start with the drawing

Share your drawing and project requirements.

Share critical dimensions, inspection standards, acceptance criteria and any traceability or test requirements.

Engineer review within 1 business day · NDA available on request · ISO 9001:2015

For the fastest drawing review, include:
  • 2D drawing / 3D file and revision
  • Material grade or service environment
  • Annual quantity or expected lot size
  • Critical tolerances, finish, inspection or pressure-test requirements

Secure verification

For larger or unsupported files, email info@chinaprecisionmetal.com.

By submitting, you agree that we may use this information to respond to your enquiry. Privacy