Quality control

Quality System

Quality planning, PPAP support, process capability and production control for investment casting, machining, finishing and inspection programs.

Quality planning starts with the drawing and risk

The control plan is built around material, critical dimensions, pressure boundaries, surface condition, assembly requirements and service risk. Incoming material, casting, heat treatment, machining, finishing, assembly and final inspection are linked through defined responsibilities and acceptance criteria.

Process-control principles

  • Verify material and heat identity before downstream value is added
  • Inspect casting conditions that could be hidden by machining
  • Establish machining datums and critical-feature relationships
  • Protect sealing, fit and cosmetic surfaces through handling and cleaning
  • Verify assembly interfaces and specified functional checks
  • Perform pressure or leak testing at the correct production stage
  • Retain the requested lot, inspection and report records

PPAP and process capability

For programs that require formal production approval, PPAP documentation can be prepared to the customer-specified submission level and linked to the released drawing, process route and inspection plan. The agreed scope may include dimensional results, material and performance records, process-flow and control-plan evidence, and sample-part records.

For agreed critical characteristics, Cpk or Ppk studies can be used to demonstrate process capability after the process and measurement method are stable. Sample size, study method and acceptance criteria are defined by the customer or project rather than assumed as one universal target.

Supplier-qualification support

We can provide the latest applicable certificates, equipment lists and sample quality records during supplier review.

Related technical and sourcing checks

Inspection evidence to specify

Request/agree at RFQ stageAcceptance criteria, test stages and required documentation
Drawing revision, critical interfaces and inspection datumsTechnique, coverage, sensitivity and acceptance standard
Reporting format, traceability and sampling levelScope, test method and evidence depend on the drawing, service risk and agreed contract.

These are documentation requirements, not downloadable actual inspection reports or proof of an individual order.

Certificates & quality registrations

Certificates and supplier-qualification records.

Start with the drawing

Share your drawing and project requirements.

Share critical dimensions, inspection standards, acceptance criteria and any traceability or test requirements.

Engineer review within 1 business day · NDA available on request · ISO 9001:2015

For the fastest drawing review, include:
  • 2D drawing / 3D file and revision
  • Material grade or service environment
  • Annual quantity or expected lot size
  • Critical tolerances, finish, inspection or pressure-test requirements

Secure verification

For larger or unsupported files, email info@chinaprecisionmetal.com.

By submitting, you agree that we may use this information to respond to your enquiry. Privacy