Quality control

Material Testing

Chemistry, ferrite and hardness verification, with mechanical and corrosion testing coordinated when required by the specification.

Verify the alloy against the purchase specification

Material testing confirms chemical composition, structure or mechanical properties. The method, sampling location, frequency and report format should be defined in the RFQ and control plan rather than assumed after production begins.

Testing resources

  • Optical emission spectrometer for chemical-composition verification
  • Ferrite measurement where specified for duplex or austenitic castings
  • Brinell and Rockwell hardness testing
  • Tensile and impact testing on the specified heat-representative or product sample
  • Salt-spray or other corrosion-related testing when required by the applicable specification
  • Qualified external or specialist testing when the project requires a method outside the routine in-house route

Coupons, samples and reports

Cast-on coupons, heat-representative samples or specimens removed from a component affect tooling and process planning. State the required sample form, acceptance criteria, third-party witness and material-certificate type at quotation stage.

Related technical and sourcing checks

Inspection evidence to specify

Request/agree at RFQ stageAcceptance criteria, test stages and required documentation
Drawing revision, critical interfaces and inspection datumsTechnique, coverage, sensitivity and acceptance standard
Reporting format, traceability and sampling levelScope, test method and evidence depend on the drawing, service risk and agreed contract.

These are documentation requirements, not downloadable actual inspection reports or proof of an individual order.

Illustrative process or factory photograph; not an actual inspection report for your part.

Illustrative process or factory photograph; not an actual inspection report for your part.

Start with the drawing

Share your drawing and project requirements.

Share critical dimensions, inspection standards, acceptance criteria and any traceability or test requirements.

Engineer review within 1 business day · NDA available on request · ISO 9001:2015

For the fastest drawing review, include:
  • 2D drawing / 3D file and revision
  • Material grade or service environment
  • Annual quantity or expected lot size
  • Critical tolerances, finish, inspection or pressure-test requirements

Secure verification

For larger or unsupported files, email info@chinaprecisionmetal.com.

By submitting, you agree that we may use this information to respond to your enquiry. Privacy