Purchasing reference

Supplier Qualification Overview

A printable summary for sourcing, engineering and supplier-quality review.

Coordinate measurement of a precision metal component
30+ yearsmanufacturing history
150 tons/monthinvestment-casting capacity
40+ CNC machinesinstalled machining capacity
U.S. · Europe · ChinaVMI, stocking & JIT support

Company and contact

Item Details
Shared website / market-facing name China Precision Metal
Legal entities Qingdao Zhonghe Precision Casting Metal Co., Ltd.; Qingdao Vastar Industrial Co., Ltd. — separate legal entities
Operating team & capabilities The same operating team handles manufacturing, engineering and commercial work for both legal entities, and both companies offer the manufacturing capabilities presented on this site
Contracting entity The legal entity issuing the quotation and accepting the purchase order or contract is identified for each customer program
China manufacturing 122 Songhuajiang Rd., Qingdao, Shandong 266510, China
North America contact 1500 Mercado Way, San Jose, CA 95131, United States
RFQ email info@chinaprecisionmetal.com

Supplier onboarding pack

A supplier-quality or sourcing team should not have to reconstruct the qualification picture from scattered pages. During onboarding we can provide or confirm the following, subject to the project scope and confidentiality requirements:

Qualification area What can be provided / confirmed
Legal identity & contracting legal entity, manufacturing address, quotation / PO entity and commercial contact
Manufacturing scope process map, relevant equipment family, capacity summary and responsibility boundaries
QMS & certificates applicable ISO / IATF / PED-related certificate records and current scope confirmation
Inspection capability equipment list, calibration status, applicable methods and sample records
Material & traceability material specification route, heat / lot identification and report linkage
Launch controls PPAP / FAI / capability evidence such as Cpk when required by the customer program
Factory audit live video walk-through or on-site review focused on the relevant process areas
Supply model standard PO, blanket order, stock-and-release, VMI, Kanban, safety stock or JIT as agreed

This structure lets a buyer qualify the actual manufacturing and supply route rather than judging the supplier from a generic brochure.

Manufacturing scope

Process Our capability
Investment casting Silica-sol lost-wax process; 3 g to 150 kg per part; 150 tons per month
Machining 40+ CNC machines; turning, turn-mill, 3-, 4- and 5-axis, HMC and VMC
Surface finishing Mirror, glossy, matte, brushed and hygienic polishing; down to Ra 0.05 μm on suitable geometry under an agreed measurement method
Additional treatment Bead, sand and glass blasting; pickling and passivation; electropolishing and other specified treatments
Pressure testing Hydrostatic and pneumatic routes
Secondary operations / part conditioning Static and dynamic balancing for suitable rotating parts; laser and mechanical marking; controlled laser-weld repair where permitted; press straightening / dimensional correction for suitable components
Industrial valves Ball, butterfly and check valves, Y strainers, pneumatic actuation and private-label programs
Production model High-mix, low-volume industrial programs; multiple part numbers, smaller repeat batches and project-specific production lots

We do not publish one universal MOQ. Practical batch size depends on tooling, alloy, part weight, setup and inspection scope. For repeat programs, VMI, blanket orders, stock-and-release and scheduled releases can separate the economic production lot from the customer's consumption quantity.

Material families

  • Stainless steels including CF8, CF8M and CF3M families
  • Duplex and super duplex stainless steels
  • Carbon and low-alloy steels
  • Heat-resistant steels
  • Nickel-based alloys
  • Other metals and selected non-metals for machining programs

State the exact grade, governing standard, heat-treatment condition, mechanical properties and repair restrictions on the RFQ.

Inspection and verification

Core inspection resources include Hexagon and Mitutoyo CMMs, spectrometry, ferrite and roughness measurement, Brinell / Rockwell hardness, pressure testing and in-house static/dynamic balance verification for suitable rotating components when specified. Project-specific routes can additionally include tensile or impact testing, corrosion testing and penetrant, ultrasonic or radiographic examination when required by the governing specification and technically suitable for the component. Specialist testing outside the routine in-house route is coordinated to the agreed requirement.

Certification documents

Original certificate documents and their stated scopes are available on the quality page. View certificates →

Applicable certificates, inspection records and project-specific documentation are confirmed during supplier qualification.

VMI, stocking, release and JIT support

For repeat programs, we support vendor-managed inventory (VMI), safety stock, blanket orders, stock-and-release, Kanban replenishment and JIT (just-in-time) delivery through warehouse arrangements in the United States, Europe and China. The warehouse location, inventory ownership, min/max or safety-stock target, forecast/consumption data, release frequency, Incoterms and replenishment rule are defined for each program.

This can reduce replenishment risk, shorten the customer release cycle and separate economical production batches from the quantity consumed at the assembly line. See the dedicated VMI, JIT & Stocking Programs page

Recommended RFQ package

  1. Controlled 2D drawing and 3D model
  2. Material grade and governing specification
  3. Annual quantity and expected lot size
  4. Critical dimensions, datums and surface requirements
  5. NDT, pressure-test and documentation requirements
  6. Packaging, delivery and target timing
  7. Supply model if relevant: standard PO, blanket order, stock-and-release, VMI, Kanban or JIT

We can also arrange a live factory walk-through during supplier qualification.

Second-source / alternate-source qualification

Qualify the same finished-part scope at each source: a casting-only offer is not equivalent to a CNC-finished and pressure-tested part. Request a revision-controlled sample plan covering material identity, critical dimensions, evidence of inspection, repair restrictions and release logistics. When ASTM A743/A743M-21 is specified for stainless castings, it defines a material specification, not an automatic supplier certification or proof for every production lot.

Existing production drawings can be reviewed specifically for second-source, alternate-source, supplier-diversification or capacity-overflow qualification. A useful package includes the controlled drawing, current annual demand, release size, current material / inspection standard, and the reason the program is being re-sourced.

Qualification can then focus on process match, capacity, QMS / ISO, inspection and traceability, documentation, tooling / fixture transfer risk, and the planned supply model rather than repeating a generic supplier questionnaire.

Engineering decision checkpoint for OEM buyers

Supplier approval documents and part-level acceptance records answer different questions. Request the current certificate and its actual scope for qualification, then specify heat/lot traceability, dimensional reports, NDT or pressure-test evidence only where the RFQ and governing specification require it.

Related technical or project evidence: Traceability | Material Testing

Approval stages for a new casting and CNC machining supplier

A supplier overview is a starting point, not proof that a specific part is qualified. Use a staged review to separate purchasing approval, first-article acceptance and release of recurring OEM orders.

  • RFQ and onboarding: Identify the actual contracting legal entity, controlled drawing, alloy/starting form, process responsibility, tooling ownership and quoted finished-part scope.
  • Sample and first article: Agree on critical dimensions, material records, applicable NDT or pressure checks, and written disposition of any deviation before accepting the sample.
  • Repeat-production release: Specify traceability, sampling frequency, engineering-change notice, nonconformance handling, forecast and delivery-release rules before issuing repeat POs.

Send drawings and qualification criteria for review

Evidence to compare before approving a second source.

A supplier capability list does not qualify a specific part. For a casting-plus-CNC quote, compare the same drawing revision, material specification, finished machining datums, test stages and required records across suppliers. The machined-castings process overview describes the production scope; the pressure valve-body manufacturing case shows where casting soundness, sealing-feature machining and inspection planning intersect. These are process references, not acceptance evidence for a different component: define approval against your controlled drawing.

VDV naming: Vastar valve brand; also used as the name of Zhonghe's casting operation.

Where to review manufacturing and sourcing evidence

The following public pages describe production, component examples and quality review. Order-specific reports, process approvals and customer references are provided only when available and appropriate for the RFQ.

Start with the drawing

Share your drawing and project requirements.

Share critical dimensions, inspection standards, acceptance criteria and any traceability or test requirements.

Engineer review within 1 business day · NDA available on request · ISO 9001:2015

For the fastest drawing review, include:
  • 2D drawing / 3D file and revision
  • Material grade or service environment
  • Annual quantity or expected lot size
  • Critical tolerances, finish, inspection or pressure-test requirements

Secure verification

For larger or unsupported files, email info@chinaprecisionmetal.com.

By submitting, you agree that we may use this information to respond to your enquiry. Privacy