Quality control

Inspection Equipment

Dimensional metrology, material verification, mechanical testing, NDT, surface measurement and pressure / leak testing are selected around the drawing and service risk.

HexagonCMM equipment
MitutoyoCMM equipment
Roughnesssurface measurement
Pressurehydrostatic and pneumatic

Quality control is wider than CMM inspection

Our inspection resources cover dimensional metrology, material verification, mechanical testing, nondestructive examination, surface measurement and pressure / leak testing. The project drawing and service risk determine which methods are required.

Control area Equipment / method Typical purpose
Dimensional Hexagon CMM, Mitutoyo CMM, conventional gauges GD&T, bores, datums, position, form and final dimensions
Material identity Spectrometer, ferrite tester Chemistry / alloy identity and ferrite where specified
Mechanical properties Brinell / Rockwell hardness; tensile / impact on specified samples Verify specified property requirements on representative test samples
Surface / corrosion Roughness measurement; project-specific corrosion / passivation verification Surface condition and specified corrosion or cleanliness evidence
NDT Penetrant; ultrasonic or radiographic examination where technically suitable Detect surface or internal discontinuities according to geometry, defect type and specification
Pressure / leakage Hydrostatic and pneumatic test resources Validate finished pressure-boundary components at the required stage

Inspection capability map for supplier qualification

Stage / risk Typical controls we can plan around the drawing Typical evidence by project
Incoming material & identity material certificate review, spectrometer / ferrite verification where required, lot identification material records, heat / lot traceability
In-process dimensions CMM, gauges and feature-specific checks at defined manufacturing stages dimensional report, control records
Mechanical / surface condition hardness, roughness and specified sample testing hardness / roughness results; project-specific test reports
Surface / internal discontinuities PT, UT or RT where technically suitable and required by the specification NDT report tied to part / lot
Pressure boundary & leakage hydrostatic or pneumatic testing at the agreed finished condition pressure / leak test record
Final release visual condition, identification, traceability, packaging and documentation completeness final inspection / release package

The purpose is not to maximize the number of tests. It is to connect risk → inspection method → manufacturing stage → acceptance criterion → retained record so buyer and supplier are working from the same control plan.

Inspection planning

A useful inspection plan identifies the feature, method, stage, sampling level, acceptance criterion and required record. CMM inspection is important, but it does not replace material verification, NDT or pressure testing when those risks exist.

Supplier-qualification support

During supplier qualification, we can provide equipment lists, calibration status, applicable certificates and sample quality records.

What makes an inspection record usable for an OEM release

Agree the following before comparing quotations or releasing a first article:

  • Drawing revision, numbered characteristic and agreed acceptance limit
  • Actual readings, measurement method, sampling plan and calibration reference
  • Part/heat/lot identity and a clear disposition for nonconformances

View the related engineering or manufacturing evidence. Examples and equipment information are not a certificate or acceptance result for a new drawing.

Send the drawing and acceptance requirements for review.

Inspection evidence to specify

Request/agree at RFQ stageAcceptance criteria, test stages and required documentation
Drawing revision, critical interfaces and inspection datumsTechnique, coverage, sensitivity and acceptance standard
Reporting format, traceability and sampling levelScope, test method and evidence depend on the drawing, service risk and agreed contract.

These are documentation requirements, not downloadable actual inspection reports or proof of an individual order.

Start with the drawing

Share your drawing and project requirements.

Share critical dimensions, inspection standards, acceptance criteria and any traceability or test requirements.

Engineer review within 1 business day · NDA available on request · ISO 9001:2015

For the fastest drawing review, include:
  • 2D drawing / 3D file and revision
  • Material grade or service environment
  • Annual quantity or expected lot size
  • Critical tolerances, finish, inspection or pressure-test requirements