Pressure Test Inspection & Records

Inspection controls, records and reporting for hydrostatic and pneumatic verification of finished pressure-boundary components.

Validate the finished boundary condition

Pressure or leak testing should be performed after ports, sealing surfaces, cleaning and final boundary configuration are defined. The inspection plan must identify medium, pressure, hold time, allowable leakage and required records.

This page focuses on inspection planning, records and release evidence. For the manufacturing service, RFQ inputs and integration with cast/machined pressure-boundary parts, see Pressure & Leak Testing Services.

Planning points

  • Confirm material and visual condition before testing
  • Inspect plugs, fixtures and connection method
  • Protect threads, sealing surfaces and thin sections
  • Test after the appropriate machining and cleaning operations
  • Use guarding, exclusion zones and written procedures for pneumatic tests
  • Retain the requested pressure curve, result data or test report

Qualification evidence

Sample test procedures and report formats can be provided during project review. The binding requirement remains the drawing, purchase specification and mutually agreed acceptance criteria.

Inspection evidence to specify

Request/agree at RFQ stageAcceptance criteria, test stages and required documentation
Drawing revision, critical interfaces and inspection datumsTechnique, coverage, sensitivity and acceptance standard
Reporting format, traceability and sampling levelScope, test method and evidence depend on the drawing, service risk and agreed contract.

These are documentation requirements, not downloadable actual inspection reports or proof of an individual order.

Illustrative process or factory photograph; not an actual inspection report for your part.

Illustrative process or factory photograph; not an actual inspection report for your part.

Start with the drawing

Share your drawing and project requirements.

Share critical dimensions, inspection standards, acceptance criteria and any traceability or test requirements.

Engineer review within 1 business day · NDA available on request · ISO 9001:2015

For the fastest drawing review, include:
  • 2D drawing / 3D file and revision
  • Material grade or service environment
  • Annual quantity or expected lot size
  • Critical tolerances, finish, inspection or pressure-test requirements